It was a very delicate operation as the 75 hull was lifted from the mould by two 50 tonne cranes

It was a very delicate operation as the 75 hull was lifted from the mould by two 50 tonne cranes

January 21, 2014

Written by Zuzana Bednarova

This image is featured as part of the article Two Riviera 75 Enclosed Flybridge Yachts under construction.

Please contact CharterWorld - the luxury yacht charter specialist - for more on superyacht news item "It was a very delicate operation as the 75 hull was lifted from the mould by two 50 tonne cranes".

Quick Enquiry

Share on FacebookShare on Twitter